Two Shelby County road projects begin Monday, November 16, with a Zaring Mill Road closure expected to continue into mid-December and a week of one-lane traffic on Vigo Road at the Franklin County line.
The longer disruption is on Zaring Mill Road, Kentucky 2861. The Kentucky Transportation Cabinet says the affected stretch runs from mile point 4.9, just past the road’s bridge over Interstate 64, to mile point 6.5 near U.S. 60, Midland Trail.
Local traffic will be permitted during the closure. Other motorists are directed to follow the signed detour using U.S. 60 and Kentucky 55.
The work is for a private developer’s entrance where it meets the state highway. Crews will adjust the roadway grade to improve visibility, according to the cabinet’s District 5 advisory. The notice gives a mid-December completion estimate rather than a specific reopening date.
On Vigo Road, Kentucky 1005, bridge maintenance will reduce traffic to one lane at mile point 11.270, on the bridge at the Franklin–Shelby county line. That restriction is scheduled from 9 a.m. Monday, November 16, through 4 p.m. Friday, November 20.
Automated flagger assistance devices will direct motorists through the Vigo Road work zone. The cabinet asks drivers to follow those signals, slow down and use caution.
The two notices describe different restrictions: Zaring Mill Road has a closure with local access, while Vigo Road remains open with one lane. Drivers who use either route should check the cabinet’s current advisory before setting out.
